Demolition License Document Requirements in UAE
Demolition is one of the most crucial steps that is usually taken when there is construction work. Whether it is tearing down a building or demolishing unnecessary areas, demolition is a process that is always involved during construction. To perform demolition, you need a permit, and we are here to guide you to the process, Demolition permit requirement and documentation needed to perform demolition in the UAE.
What are the documents required for a Demolition License in the UAE?
1. Demolition Permit Application: One of the demolition permit requirements is to fill an application for demolition permit. You are eligible to fill the form if you are a contractor.
2. Copy of plan: A contractor needs to provide a copy of site setting out plan which mentions which area is being planned to demolish.
3. NOC and other relevant documents: You need to submit an NOC from a relevant authority. There are different documents for different methods of demolition like for mechanical methods- NOC from DEW.
4. Layout of fence / hoarding: It is also necessary to avail a layout of fence so that they can get a clear image of the demolition area.
5. Method statement: You need to submit a method statement along which you will need to submit specific HSE and an emergency plan with the risk assessments.
Things to consider when applying for demolition permits
1. Environmental Impact Assessment: Demolition is a process where it is natural that dust, noise and hazardous waste will be created which can impact the environment. It is necessary to make sure that you have an environmental impact assessment if needed. An environmental impact assessment report must be submitted to demonstrate that adequate steps will be taken to mitigate these risks.
2. Safety Plan: To obtain the license you will have to make sure that you have a safety plan where worker safety measures have been taken care of. You also need to make emergency response plans and procedures for handling hazardous materials like asbestos or lead.
3. Waste Management Plan: When there is a demolition process it is obvious that there will be a lot of waste during the process. To control that wastage, you need a plan that will be shown to the authority. This is one of the Demolition permit requirements.
Process of Demolition License Application
1. Login to DDA Portal
2. Create new project for demolition
3. Selection the application for demolition permit
4. Fill the application
5. Upload required documents
6. submit Application
7. Pay the fees.
Terms and Conditions for Demolition Process
1. If the demolition does not start within 3 months, then the permit will be cancelled, and you will have to reapply the application.
2. You will have to submit a description of the demolition method in detail.
3. You must have an insurance policy for the construction work.
Also Read: Top 10 Civil Engineering Companies in UAE
Conclusion
So, if you are someone who is willing to perform demolition in the UAE then the above mentioned are all the necessary details you need to know. Demolition can affect many factors which is why you need to take care of many things while applying for demolition permits.
FAQs
1. Why is Environmental Impact Assessment needed?
Demolition is a process where it is natural that dust, noise and hazardous waste will be created which can impact the environment. It is necessary to make sure that you have an environmental impact assessment if needed. An environmental impact assessment report must be submitted to demonstrate that adequate steps will be taken to mitigate these risks.
2. What is the process of demolition licence application?
The following are the steps for the process of demolition licence application:
1. Login to DDA Portal
2. Create new project for demolition
3. Selection the application for demolition permit
4. Fill the application
5. Upload required documents
6. submit Application
7. Pay the fees.
3. Can demolition permits be renewed?
If the demolition does not start within 3 months, then the permit will be cancelled, and you will have to reapply the application.