Getting building permits are important when you are in a construction business. It helps in making you build a structure that is safe, sustainable, and shapes infrastructure properly. Permits are required so that the projects of construction align with the regulations and community goals. Many contractors struggle to get building permits and even if they do it takes a lot of time. With this article you will get to know the whole process and documentation so that you can easily get a building permit in Delhi. Let’s get to know the process, documentation, and more for building permits in Delhi.
– A Building Plan prepared by an engineer or an architect
– Name, Address, and Registration Number of the contractor
– Copy of valid license
– Property Assessment
– Property PID Number
– Declaration proforma comprising Certificate of appointment of professionals
– Certificate of Structural Safety
– Certificate for supervision
– Fill a Common Application Form (From- www.mcdonline.nic.in.)
– Pay the requisite charges
– Fill Required NOCs
– Register the Architects or Engineers
– The applicant should not have a physical interface with external NOC agencies
– Plan is inspected by MCD & NOC agencies
– Issue digitally signed sanction letter and approved plan
This information will help you with the classification for approval of building on the basis of risk. Following are the risk matrix with the help of which you can compare your plan. This will help you get fast approval if your plan lies under these measures.
1. Residential Building
– Under 105 sqm and 15m height falls under “Very Low Risk” Category (Time- only intimation through Saral)
– From 105m to 500 sqm and 15m height falls under “Low Risk” Category (Time- 10 days)
– Above 500 sqm and 15m height falls under “Moderate Risk” Category (Time- 20 days)
– Group Housing with 15m & above height falls under “High Risk” Category (Time 30 Days)
2. Warehouses and Godowns
– Under 250 m2 and 15m height falls under “Very Low Risk” Category (Time- 10 days)
– Above 250 m2 up to 2000 m2 (category A) and below 15m height falls under “Low Risk” Category (Time- 20 days)
– Up to 2000 m2 (category B) and below 15m height falls under “Moderate Risk” Category (Time- 20 days)
– Above 2000 m2 (category B) and below 15m height falls under “High Risk” Category (Time 30 Days)
3. Other Buildings
Every other building that is to be built falls under the category of either “Moderate Risk” or “High Risk” depending on the area and height. The time period for sanction can be 20 days for moderate risk and 30 days for high risk.
– The Building Permit remains valid for 5 years and if the building construction is taking more than 5 years, the building permit should be renewed.
– The unauthorized colonies are not sanctioned but if you have unauthorized regularized colonies, you can get bldg. plan sanctioned (online).
– In specialized areas or village abadies, the road access should be maintained as per Regularization Plan, Development Plan and DDA Notifications.
Also Read: Building Permits: Process, Documents Required & Importance
Above mentioned are all the required information you can get to get building permits in Delhi. We have mentioned the process, documents, terms and conditions, and Risk Based Matrix of Building. If you are someone planning to apply for a building permit in Delhi, then this article is for you.
For more information visit: https://mcdonline.nic.in/portal
1. What is a building permit, and why is it important in Delhi?
A building permit is an official authorization required for constructing, renovating, or demolishing a building. In Delhi, it ensures compliance with safety standards, zoning regulations, and sustainability measures, preventing legal disputes and ensuring public safety.
2. Can I get a building permit for an unauthorized colony in Delhi?
Building permits are generally not issued for unauthorized colonies. However, if the colony is regularized, you can apply for a building plan sanction online.
3. How long is a building permit valid in Delhi?
A building permit is valid for 5 years. If construction exceeds this timeframe, the permit must be renewed.
4. What are the terms and conditions for maintaining road access in specialized areas?
In specialized areas or village abadies, road access must comply with the Regularization Plan, Development Plan, and DDA notifications.
You don't have to be at your desk or wait for updates anymore if you…
When you run a civil project, you have to keep track of a lot of…
Cranes and concrete frequently get the most attention in construction. But the real work is…
Construction management doesn't limit to bringing brick, cement, and steel together, it is about many…
In construction, we track materials and labor but forget the machines doing the real heavy…
You already know the problem if you've ever had to send that text that says,…
This website uses cookies.